The Triad is getting the infrastructure to match its ambitions. An Eastern Beltway that will remove 20,000 cars per day from Highway 52. An I-40 widening to eight lanes. A $4.7 billion aerospace facility at PTI Airport. And 17 miles of new waterlines being installed to support the mega site where Toyota is building the largest battery manufacturing plant in North America. This region is being re-engineered from the ground up.


  • Toyota-driven investment: I-85 expansion is directly tied to Toyota battery campus success. Infrastructure supports manufacturer needs.

  • Industrial property access: Property with I-85 access or near planned industrial roads will see higher value and faster appreciation.

  • Supply chain routing: I-85 corridor will carry increased battery and component shipments. This is not typical commuter traffic.

  • Multi-year timeline: I-85 expansion is multi-year project. Phased improvements will create timing opportunities and risks.

Highway projects

ProjectCostTimeline
Eastern Beltway (17 miles, 421 to Hwy 52)$500M+Completion end of 2026
I-40 widening to 8 lanes$300M+4 lanes each direction by end 2026
I-40/I-74 interchange$150M+Completion end of 2026
US-421/I-73 completion$200M+Multi-phase, ongoing

The Eastern Beltway is 17 miles of new highway connecting US-421 to Highway 52 in Rural Hall, bypassing congested downtown Winston-Salem entirely. When it opens, an estimated 20,000 cars per day will divert from Highway 52 to the beltway. That’s a huge relief for both commuters and commercial truck traffic serving the Triad’s distribution industry.

I-85 expansion supports manufacturing cluster

  • I-85 corridor improvements directly support Toyota battery campus and supply chain
  • Industrial access roads being upgraded to handle manufacturing traffic
  • Rail intermodal improvements support battery and component shipping
  • Highway and industrial infrastructure investments are confirmed capital projects
  • Property with direct I-85 access will see disproportionate appreciation

Infrastructure timing and execution risks

  • I-85 expansion is multi-year; not all improvements complete simultaneously
  • Industrial road and rail upgrades depend on coordination with multiple agencies
  • Construction activity during I-85 work may disrupt business operations
  • Supply chain routing assumptions may change as Toyota ramps production

I-40 is getting widened to four lanes in each direction between key Triad interchanges, with completion targeted for the end of 2026. When you combine this with the I-40/I-74 interchange upgrade, the Triad’s east-west connectivity improves dramatically. For industrial and distribution properties that rely on I-40 for goods movement, this is a direct benefit.

JetZero at PTI Airport: $4.7 billion

JetZero announced plans to build a $4.7 billion, 3-million-square-foot aerospace facility at Piedmont Triad International Airport. Construction is expected to start in early 2026. The project would create thousands of construction jobs and over 14,500 permanent high-tech positions.

This is the kind of announcement that transforms a metro. PTI Airport already has a strong relationship with aerospace — Honda Aircraft has been building jets here for nearly 20 years, and Boom Supersonic completed a $500 million facility nearby. JetZero would triple the aerospace cluster and make the Triad a nationally significant aviation manufacturing center.

For commercial property owners near PTI, the implications are enormous. Aerospace suppliers, testing labs, logistics companies, and training facilities would all need space within commuting distance of the campus.

Mega site utility infrastructure

NCDOT and the City of Greensboro completed final design drawings for 17 miles of new waterlines, 9 miles of sewer line, and a lift station for the Greensboro-Randolph mega site — where Toyota’s $13.9 billion battery plant is operating. That’s not just infrastructure for Toyota. It opens up thousands of surrounding acres for supplier operations, distribution centers, and commercial development.

Thinking about selling?

Get a confidential opinion of value. No obligation.

    Related: Top Employers in the Greensboro-Triad Region

    As we detailed in the Triad growth drivers article, Toyota’s 5,100 jobs will be accompanied by a supply chain of dozens of companies. Each one needs utility infrastructure, and this build-out makes that possible.

    Greensboro transit

    The Greensboro Transit Authority is planning bus rapid transit along key corridors, with a focus on connecting employment centers to residential areas. While the Triad doesn’t have the transit investment level of Charlotte or Raleigh, the planning indicates the region is preparing for the population growth that Toyota, JetZero, and other employers will generate.

    Impact on commercial property

    The Greensboro-Triad market is the direct beneficiary of this infrastructure surge. Better highways move goods faster. Utility expansion opens new development sites. Airport improvements attract aerospace companies. Every project on this list creates demand for commercial space.

    If you own property in the Triad, the infrastructure pipeline signals serious long-term growth. Buyers who track this stuff are paying attention — and paying accordingly.

    Seller takeaway

    Triad infrastructure is built to serve Toyota. I-85 expansion and industrial access improvements are confirming the manufacturing shift. Call Roth Capital at 704-600-3839 to discuss your Triad property and its position relative to I-85 and industrial corridors.

    Let’s talk about your property. 704-600-3839.

    Ready to explore your options?

    Tell us about your property. We will follow up within one business day.

      Jim Kittridge

      Founder of Roth Capital. Direct buyer of commercial and industrial properties across North Carolina and South Carolina.